Thursday, June 23, 2011

6/23/11-Day Four

Not a lot of major changes today-but we were working on detail work to the wings like installing the gas tanks and detail work to the fuselage area like installing the control sticks and the seat pans.


Eric working on the seat rails


I installed these (4) CHT (cylinder head temperature) thermocouples into the engine-it took about an hour because of the tight spaces (no room to get a wrench in)


One of (4) gas tanks ready to be installed into the wings


Rudder installed


Bottom of the cabin with some of the wiring installed


Seat pans installed


Control sticks being synchronized